ARMS® on Mobile®
Laminaar Aviation InfotechBusinessGoogle PlayARMS® on Mobile® revenue and downloads, last 30 days
How we got this (8 inputs)
- signals
- free, no IAP, on no grossing chart; ratings ÷ age
- method
- free, no IAP, on no grossing chart
- note
- the store lists no in-app purchases: likely monetises outside the store; range runs from $0 to what a comparable app with in-app purchases makes at its median
- likelyLow
- 0
- likelyHigh
- 1716.51
- confidence
- low
- rough
- order of magnitude
- observed days (of 30)
- 2
As of Nov 21, 2026.
How we got this (13 inputs)
- signals
- Play installs ÷ age; lifetime→current drift ×/÷4.12 (135278 measured Play counter deltas)
- spread
- measured on downloads ground truth (downloads ground truth: 48 App Store milestones, 33 platform splits, 13 drift points)
- installs
- 41868
- age days
- 3769
- note
- install counter did not move in 2.18 day(s); the counter moves in steps, so this is not read as zero
- bound
- at most the lifetime installs counter (41868) over 30 days: the listing is 3769 days old, so its last 30 days cannot hold more installs than it ever had
- range scale
- ×0.88 (coverage scale on 9 ground-truth rows; publication is decided before it)
- likelyLow
- 288
- likelyHigh
- 1037
- confidence
- medium
- observed days (of 30)
- 2
- measured days
- 0
- scaling
- observed days, scaled to 30
As of Nov 21, 2026.
How we got this (13 inputs)
- method
- installs in the window (all active on install day) + earlier installers active in the month (published retention ÷ the category's DAU/MAU stickiness) + the retained base of installers older than two years
- downloads per day
- 18.23 (5.4 to 61.33, the published worldwide figure)
- retention
- day 1 / 7 / 30: 17.88% / 4.93% / 1.85% (Android benchmark × 0.88 for the category; AppsFlyer Q3 2024 day-1/7/30 retention, via getstream.io/blog/app-retention-guide (read 2026-11-16); category: OneSignal 2024 day-30 retention by category, via getstream.io/blog/app-retention-guide (read 2026-11-16))
- active days per install
- 4.84 over 730 days (age 3769 days; the curve is used to 730)
- stickiness
- 17.5% DAU/MAU, Productivity & Tools median (MWM DAU/MAU medians, US iOS, May 2026 (mwm.ai/glossary/dau-mau, read 2026-11-16))
- parts
- window installs 547 (the published 30-day downloads), earlier installers 325, retained base 1189
- retained base
- 28558 installers older than 730 days (lifetime from the listing's Play installs counter) × 4.16% active in a month (between 1.23%, the benchmark curve held flat, and 14.1%, median disclosed MAU ÷ lifetime installs of Duolingo, Snapchat and Grindr (company filings, data/ground-truth-active-users.csv; chosen on these rows, scored leave-one-product-out)); range ×/÷2 past each (widened after the leave-one-product-out check)
- spread
- downloads ×/÷3.37, retention ×/÷3, tail ×/÷1.56, stickiness ×/÷1.8, retained base ×/÷6.78 (assumptions; not fitted)
- ratings per download (recorded, not used)
- 0.0072
- chart persistence (recorded, not used)
- 0 day(s) on a chart in the window; fewer than 7 live days exist
- tier
- modelled: retention and stickiness are published benchmarks, not measured on this listing
- confidence
- low
- rough
- order of magnitude
As of Nov 21, 2026.
Daily active users
Modelled from this app's downloads and a published retention curve for its store and category, not measured. Read it as an order of magnitude.
History
Daily readings as we observed them, last 30 days worldwide. Free shows the last 30 days.
Downloads per day
Observed by us since Nov 19, 2026.
Revenue per day
Observed by us since Nov 19, 2026.
Ratings (worldwide)
Observed by us since Nov 19, 2026.
Installs, Play counter
Observed by us since Nov 19, 2026.
Monthly history: we have found no public-archive copy of this store page from the last 12 months, so monthly readings start with our own in Nov 2026.
Create a free account to save apps; Pro shows full history.
Chart positions
Where this app ranks on the top free, paid and grossing charts we capture.
Search terms
No search terms read for this app yet. Terms are read from its title and the searches it shows up in, and appear here once ranked.
In-app purchases
Prices
In-app purchase ladder, price changes and paywall terms
No in-app prices recorded yet. We read them from the store listing: either this app sells none, or its listing has not been read yet.
Ratings and reviews
Rating distribution
Store histogram
477 ratings
Recent reviews
Marketing
Paid ads, organic videos and onboarding captured for this app.
Paid ads
No Meta, Google or TikTok ads tied to this app yet. We check the public ad libraries daily.
Organic videos
No YouTube, TikTok or Instagram videos tied to this app yet.
Change history
Versions, price changes, rank jumps and listing edits, as we observed them.
Details
- Developer
- Laminaar Aviation Infotech, 1 app
- Package
- aom.armsproject
- Category
- Business
- Price
- Free
- Released
- Jul 27, 2016
- Updated
- Apr 4, 2023
- Version
- 2.4.9
- Size
- -
- Content rating
- Everyone
- Website
- www.laminaar.com
- Contact email
- aomfeedback@laminaar.group
- Privacy policy
- www.laminaar.com/policies/
- Languages
- Not available
- Charted in
- United States
- First seen
- Nov 19, 2026
- Listing read
- Nov 21, 2026
Show store descriptionShow less
The latest Mobile solution from Laminaar Aviation Infotech Pvt. Ltd. is an extension of the ARMS® V2 Suite. A state-of-the-art mobility solution that offers Airlines and Air Operators access to various Crew specific information from across various sub- systems of the ARMS® V2 Suite. AOM provides data to end-users in real time, as well as offline mode. The same investment can also enable the use of rapidly proliferating "Mobile Smartphone Devices" for other functions as well, e.g., for Cabin Crew, MNE Crew and Load Masters, etc., all controlled by a unified Backend Server infrastructure. “ARMS® on Mobile®”- comprises the Server-side components and the Mobile-side (Client) application. The other big advantage of “ARMS® on Mobile®” is that it is an integral part of the ARMS® V2 Suite; which means it can seamlessly integrate with all the other sub-systems of ARMS® Suite thereby offering a truly integrated end-to-end Mobility solution.
More like this
- Top Business on Google Play by estimated revenue
- ARMS® on Mobile® alternatives
- ARMS® on Mobile® vs CIBTP & Moi
- ARMS® on Mobile® vs Mind Mapping - Mind Map Maker
- All top charts and categories
Similar apps
CIBTP & MoiCIBTP France3.9 ★ (479)
Mind Mapping - Mind Map MakerGeniusTools Labs3.4 ★ (479)
Bolt MerchantBolt Technology4.6 ★ (480)
PeopleDeskAkij iBOS LIMITED4.1 ★ (480)
ТОМЧИMinistry of Water Resources of Uzbekistan5.0 ★ (480)
FirstupFirstup, Inc.3.0 ★ (480)
AI Invoice Maker & Receipt AppCodix Apps
BCA BuyerBritish Car Auctions3.3 ★ (478)